Mt Baker paving/maintenance
Results 1 to 3 of 3

Thread: Mt Baker paving/maintenance

  1. #1
    Lee RideFar Array elevation's Avatar
    Join Date
    Sep 2005
    White Rock
    Ninja 1000

    Mt Baker paving/maintenance

    Had a perfect ride up Mt Baker today. This is probably the best time of the year to ride it as Artist Point is open. About 5-10 miles before you start to climb Mt Baker there is 2 miles getting paved. It is the twisty section and it is almost done. It will be race track smooth! I also noticed alot of markings on the road up to the top so it looks like sections may be repaved/repaired as well.

    All of South Pass Rd (Nooksack to Maple Falls) is still in great shape too.

    Best ride in town!

    Name:  IMG_0835 (Medium).jpg
Views: 138
Size:  92.6 KB

    Name:  IMG_0831 (Medium).jpg
Views: 136
Size:  123.2 KB

    Name:  IMG_0837 (Medium).jpg
Views: 136
Size:  110.6 KB

    Name:  IMG_0841 (Medium).jpg
Views: 136
Size:  140.9 KB

    Be sure to say hi to Indian Fonzie at the top!

    Name:  IMG_0843 (Medium).jpg
Views: 134
Size:  149.4 KB

  2. Remove Advertisements

  3. #2
    Registered User Array ProPs's Avatar
    Join Date
    Sep 2003
    Thanks for the update.
    Human Crayon

  4. #3
    Moderator Array CHIA's Avatar
    Join Date
    Oct 2007
    New West
    Hmmm, thinking bout tomorrow, but have so much work to deal with!
    Quote Originally Posted by G Hats View Post
    A sore ass is better than a shredded back!

    ** BIKE NIGHTS 2013 **

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts